<strike id="pvn7l"></strike>
<strike id="pvn7l"><video id="pvn7l"><strike id="pvn7l"></strike></video></strike><strike id="pvn7l"><dl id="pvn7l"></dl></strike><span id="pvn7l"><video id="pvn7l"><ruby id="pvn7l"></ruby></video></span>
<span id="pvn7l"><video id="pvn7l"></video></span><ruby id="pvn7l"><dl id="pvn7l"><del id="pvn7l"></del></dl></ruby>
<strike id="pvn7l"><dl id="pvn7l"></dl></strike>
<span id="pvn7l"><video id="pvn7l"></video></span>
<strike id="pvn7l"><video id="pvn7l"><ruby id="pvn7l"></ruby></video></strike>
<span id="pvn7l"><video id="pvn7l"><strike id="pvn7l"></strike></video></span> <span id="pvn7l"><dl id="pvn7l"></dl></span><strike id="pvn7l"></strike>
<span id="pvn7l"></span><ruby id="pvn7l"><dl id="pvn7l"><ruby id="pvn7l"></ruby></dl></ruby>
<span id="pvn7l"></span>
<span id="pvn7l"><video id="pvn7l"></video></span>
經驗豐富完美服務

北京全市免費上門看現場!

北京消防改造公司電話

4000-346-119

聯系我們

  • 電話:400-0346-119
  • 電話:010-57113119
  • 郵箱:506665119@qq.com
  • 地址:北京通州區新華北路117號
  • 消防資訊

    氣體滅火安裝:七氟丙烷氣體滅火調試驗收

    來源:北京消防改造公司  時間:2020-09-18 14:37:21

    氣體滅火安裝:七氟丙烷氣體滅火調試驗收
    氣體滅火安裝完畢后,施工單位應對每個系統進行自檢和調試,自檢時應按要求對檢測項目逐項檢測。監理工程師在調試過程中應嚴格監督,按照規范要求的合理周期對系統進行連續不中斷試運行,并做好調試驗收記錄。
    ①調試前應按規定檢查系統組件、材料的型號、規格及系統安裝質量。
    ②調試項目應包括模擬啟動試驗、模擬噴氣試驗和模擬切換操作試驗。模擬噴氣試驗按防護區總數(不足10個按10個計)的10%進行。滅火氣體應采用氮氣進 行模擬試噴,氮氣瓶充裝壓力不應低于藥劑鋼瓶貯存壓力,且容器結構、型號、規格應相同,數量不少于藥劑瓶的20%,且不得少于1個。
    ③氣體滅火安裝調試應按《氣體滅火系統施工及驗收規范》GB50263-2007第六章的規定執行。試驗方法按該規范附錄E的規定進行。
    ④在報警噴射階段,應有相應的聲、光信號,并能手動切除聲響;消防控制中心應有噴放顯示。
    ⑤在延時階段,應有自動關閉門窗、空調機及有關部位的防火閥,試驗1-3次,顯示工作及故障狀態。模擬不需要啟動滅火系統進行滅火的情形,按下緊急停止按鈕,手動控制氣體滅火系統的執行。